2 parts of 15 parts of a Detailed Schedule of tasks to build a house



The below is an excerpt from a book of 309 pages, 19 Chapters, 10 Appendices
                  - (See Amazon for URL link to preview, following this.)

Appendix B – Complete Detailed Building Schedule

This appendix [excerpt] contains [part of the total] compiled detailed building schedule -a list from the fifteen partial lists (A-O) presented in the chapters of this book. The tasks shown should adequately cover the majority of details needed to complete a dwelling in chronological order.
Verify some municipal requirements with your city, county, and state authorities, as those detailed in this book reflect mostly Tennessee, Colorado, and Florida stipulations. Regulations, dimensions, and quantities are based on state codes, local requirements, and the Uniform Building Code that change frequently.


Planning & Preliminary - Part A         [1 part of 15 parts of the total schedule]

The below partial list, Part A of the Detailed Building Schedule, is from Chapter 2:
  • Record Data: area (sq. ft.): 1st floor ________ 2nd floor ________ =Conditioned area (inside brick.) Garage area (outside blocks)= ________. Miles to Job______ Slab area(block to block, w/garage)_____. Lin. Ft. of outside footers _____1st floor ____2nd floor. _______Lineal ft. of perimeter with garage.
  • Preliminary Preparation: Rough estimate of Lot cost. Get wetlands study (Florida) on lot, _________________ environmental engineer ________________phone.
  • Lot Purchase Date ______________, Closing title Co. _____________________phone. Quit Claim Deed to LLC before construction permit pulled.
  • Get developer’s SWPPP32 (storm water pollution prevention plan) permit number before closing lot purchase. –See Chapter 4.
  • Liability insurance coverage may be increased by an umbrella policy if lot owned personally (not by LLC).
  • Record Deed with county-Money order, Return envelope, certified (TN,) Verify recorded).
  • Get address assignment for lot before Bldg. Permit & closing for lot description. _________________ Bldg. Dept. phone number.
  • LLC Needs Contractor’s Liability Insurance (cheaper through Home Builder's Assn.)
  • Need Workman’s Compensation insurance to cover Subs.
  • Need Builder’s Risk Insurance.
  • Warranty company: (HBW5 or BBHWA6) “Notice of Starts” or “Construction Indication” form before breaking ground. BBHWA call for “Risk Management number” _______________ phone number.
-----------------------------------------------------------------------------------------------------

Drawings & Estimates - Part B     [1 part of 15 parts of the total schedule]

The below partial list, Part B, is from Chapter 3:
  • Detailed estimate of construction costs (Appendix F.)
  • Drawing pages required by code enforcement for permit application: (e.g., per Shelby County, TN, 3 site, 5 floor, 2 roof, 2 joist, 1 elec, 1 plumbing, 1 slab section, stair detail, cornice detail, sections & other details.) (For the state of FL see List in the Bldg. Code.) Include 2 Duplicate plan sets for use in builder's office.
  • Additional Plan Sets needed for early QUOTES from subs & suppliers:
  1. Electrical,
  2. HVAC,
  3. Plumber,
  4. Framer, trusses,
  5. lumber. Request return of plans with proposals.
  6. Small scale (1/8” = 1’) for convenience and copying.
  7. Have FL Engineer stamp and produce structural drawings and details.
  8. Truss company quote (truss drawing details come with truss order) - Chap.8.
  9. Architectural Control Committee review in your subdivision / HOA.
  • Accurate quotes desired early (after lot purchase, design, & prior to grading) are:

  1. Grading & lot clearing quote
  2. Roof Trusses and Truss joists
  3. Appliances (to lock in price): Microwave, oven, Double or separate 2nd oven & Range /downdraft, trash compactor, dishwasher, disposer, sink
  4. Framing quote
  5. Stone countertops (cultured? quartz composite?)
  6. Wrought Iron: Gate, crawl space grilles, mailbox, balcony, stair rails
  7. HVAC
  8. Plumbing (see Chapter 7 for discussion)
  9. Electrical (see Chapter 10 for discussion)
  10. Slab labor quote
  11. Window & exterior Door quote.
[continued in book, Total schedule is 15 parts - 2 shown on this post]